Production Analytics
Live MES intelligence — recalculated automatically after every save, edit or delete.
Machine Performance Ranking
Ranked by OEE — Availability, Performance, Quality, Production and Downtime
| # | Machine | Dept | Unit | Entries | Production | OK | Scrap | Downtime | A | P | Q | OEE |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| No data for the selected filters. | ||||||||||||
Department Comparison
OEE / A / P / Q and production by department
| Department | Unit | Production | Target | OEE | A | P | Q |
|---|---|---|---|---|---|---|---|
| No data for the selected filters. | |||||||
Production vs Target
Target vs actual production by date, with OEE overlay — quantities in —
Shift Comparison
OEE, production, scrap and downtime by shift — quantities in —
| Shift | Entries | Production | Scrap | Downtime | OEE |
|---|---|---|---|---|---|
| No data for the selected filters. | |||||
Hourly Production Trend
OK vs scrap output attributed across the shift hours — quantities in —
Operator Performance
Production, OEE, downtime, scrap and productivity (output per operating minute) — quantities in —
| Operator | Entries | Production | OK | Scrap | Downtime | Productivity (per min) | OEE |
|---|---|---|---|---|---|---|---|
| No data for the selected filters. | |||||||
Product-wise OEE
By item code / description
| Product | Entries | Production | OEE | A | P | Q |
|---|---|---|---|---|---|---|
| No data for the selected filters. | ||||||
Product-wise Scrap Analysis
Scrap quantity by product, with machine breakdown below — quantities in —
| Machine | Department | Unit | Scrap | Production | Quality |
|---|---|---|---|---|---|
| No data for the selected filters. | |||||
Machine Utilization
Running, idle, setup and breakdown minutes with utilization %
| Machine | Dept | Planned (min) | Running (min) | Idle (min) | Setup (min) | Breakdown (min) | Other DT (min) | Utilization |
|---|---|---|---|---|---|---|---|---|
| No data for the selected filters. | ||||||||
Capacity Utilization
Installed capacity (ideal output for net available time) vs actual production — each department in its own unit (Kg / Rolls / Sets)
| Department | Unit | Capacity | Actual | Utilization |
|---|---|---|---|---|
| No data for the selected filters. | ||||
Downtime Pareto
Top 10 loss reasons — minutes and cumulative %
Machine Health Summary
Healthy / Warning / Critical from OEE and downtime share
Cost of Production Loss
Loss value from breakdown, setup, other downtime and scrap
| Department | Breakdown | Setup | Other DT | Scrap qty | Breakdown cost | Setup cost | Other DT cost | Scrap cost | Total |
|---|---|---|---|---|---|---|---|---|---|
| No data for the selected filters. | |||||||||
Interactive Drill-down
Department → Machine → Shift → Operator → Product → Transaction details — quantities in each department's unit (Kg / Rolls / Sets)
| Department | Unit | Entries | Production | OK | Scrap | Downtime | A | P | Q | OEE | |
|---|---|---|---|---|---|---|---|---|---|---|---|
| No data for the selected filters. | |||||||||||